Location:
Wilton, ND |
Capacity:
49.5 MW
|
Type of Power:
Wind |
Placed into Service:
June 2006 |
Project Links:
FPL Energy Plant Fact Sheet |
|
 |
This project is being developed by FPL Energy (FPL) and is located about three miles southeast of the town of Wilton, ND and approximately 18 miles north of the capital city of Bismarck. The 8,000-acre wind farm produces enough power for 30,000 homes.
BEF uses the Green-e Climate's "Protocol for Renewable Energy" to certify this project for use in Green-e Climate certified Wind Green Tags and Wind & Solar Green Tags, and to calculate the reduced greenhouse gas emissions caused by this project. This project passed the following additionality tests required by Protocol for Renewable Energy: (1) Performance and Technology Test, (2) Timing Test, and (3) Legal and Regulatory Test. |
|