Project Partners:
Tanadgusix Corporation
|
Location:
St. Paul Island, AK |
Capacity:
588 MWh (by one wind turbine)
|
Type of Power:
Wind |
Placed into Service:
June 12, 1999 |
Project Links:
Tanadgusix Corporation |
|
 |
The wind facility of Tanadgusix Corporation is located on Saint Paul Island, off of the Pribilof Islands in the Bering Sea, 770 miles southwest of Anchorage. TDX's innovative high penetration and no storage wind/diesel hybrid CHP project incorporates one Vestas V27 wind turbine that provides 588 MWh per year to TDX's POSS Camp, an 80,000 square foot industrial facility and airport, as well as reducing its diesel fuel heating load.
An additional two Vestas V27 turbines are proposed to be sited next to the current one and will require less than an acre of land to be excavated of the twenty-acre original tract.
|
|